This windmill installation located on Route 69 in Mexico, NY features a 10kw bergey windpower Excel-S turbine combined with a Powersyce II Inverter. The tower is Grid-Tied and averages between 12,000-14,000 kilowatt hours per year. The Fleming family saved over $40,000 on the overall project cost through the following incentives:
Incetives Obtained:
45% NYSERDA Incentive
30% Federal Tax Credit of Gross Installed Cost
Latest News For Alternative Power Solutions
Sunpower Solar


Wind Turbines